TIRELIElectrical Ltd
Our work

Projects delivered across the mining sector

From 33kV overhead lines and gold-concentrator control systems to server-room ducting and design-and-build construction — filter by discipline below.

Electrical
Completed

Kansanshi Mine

3.3kV Overhead Line — Muliashi South

Sub-contracted to construct and commission a 3.3kV overhead line of 1,885 metres in length.

Electrical
Completed

Kansanshi Mine

250MVA Transformer Cabling

Installed two 150mm² 4-core armoured cables, glanded, lugged and terminated on the 250MVA transformer and EW2 substation for the main boiler workshop.

Electrical
Completed

Kansanshi Mine

Gold Concentrator Control Systems

Installed Knelson Gravity and Falcon concentrators, power & control cables for 355kW motors, VSDs and chokes, plus HMI control boards.

Electrical
Completed

Kansanshi Mine

Analytical Laboratory Electrification

Electrified the metallurgical and analytical laboratories and offices — powering and commissioning drying ovens, shakers, mixers and separators.

Electrical
Completed

First Quantum (FQMO)

Haul Road & Workshop Lighting

Installed lighting along the haul road from the main pit to the crusher, and wired boiler, drills and WHBO workshops.

Electrical
Ongoing

Kansanshi Mine

Cable Racks, Optic Fibre & Tower Lights

Construction of electrical cable racks, installation of electrical and optic-fibre cables, VSD glanding & termination, and 40-metre tower light assembly.

Air Conditioning
Ongoing

Kansanshi Mine

Substation AC & Refrigeration

Installation and servicing of air conditioners across substations, offices and housing units, including running copper tubing and commissioning Fujitsu 96,000 BTU units.

Air Conditioning
Completed

Kansanshi Mine

Administration Block Ducting

Installation and commissioning of flexible duct at the administration offices, with repair and servicing of AC across the block and substations.

Air Conditioning
Completed

First Quantum (FQMO)

Offices, Houses, Cold Rooms & Chillers

Air conditioner installation across offices and houses, including cold rooms, chillers and ongoing servicing, plus the Bwana Mkubwa acid plant.

Air Conditioning
Completed

Konkola Copper Mines (KCM)

IT Server Room Ducting

Assembly of metal duct for the IT server room, plus metal duct and pressurising fan installation at Smelterco, Nkana Mine.

Civil Works
Completed

Jaid's Hardware

Jaid's Hardware — Design & Build

Full design and build including the main shopping hall, ablution block and kitchenette — steel trusses, IBR roofing over 310m², wall building, plastering, 400m² of floor tiling, plumbing and electrification.

Civil Works
Ongoing

Kansanshi Mine

Inspection Manholes & IT Distribution

Construction of inspection manholes and a distribution board enclosure for IT infrastructure.

Civil Works
Ongoing

Solwezi Nursing School

Midwifery Hostels Rehabilitation

Rehabilitation of three hostels for the midwifery nursing programme.

Have a project like these?

Tell us about your site, scope and timeline. We deliver quality work, on time and to standard, wherever you operate in Zambia.